You need to have an over view of what will take place so here is a brief process stage by stage
Stage 1
A representative will give a written fixed-price quotation FREE of Charge
Stage 2
Contract agreed, Structural Surveyor calls to house to take measurements, and the plans are designed & drawn
Stage 3
Plans are emailed / posted for client approval
Stage 4
We will take care of all the necessary Planning and Building Applications
Stage 5
Steel fabrication, Universal beams ( Steels ) are designed and fabricated
Stage 6
Scaffolding erected and skip delivered
Stage 7
Craftsmen arrive on site as agreed, 8.30am approx and prepare loft for installation of Steels and floor load
Stage 8
Steels arrive including all materials and craned up into the roof area
Stage 9
Steels and floor load installed
Stage 10
Dormer is erected, Velux's fitted
Stage 11
First fix Electrics & Plumbing begin
Stage 12
Loft constructed - fire proofed – insulated .
First Inspection from Building Control Completed
Stage 13
Cut out for Stairs – Stairs Installed
Stage 14
Plaster Boarding completed
Stage 15
Plastering completed
Stage 16
Second fix Electrics & Plumbing completed
Stage 17
Second fix carpentry completed
Final Inspection from
Building Control Completed
The Hand-over
Your loft is now complete and ready for decoration. Building control will now send you your completion certificate.